Keep on Trucking

With the foundation anchors poured, work continued.

Water was brought up from the bottom of the ridges to the school for use in concrete mixing.

The surface had to be leveled flat to make sure the tank would not shift and roll away.

On a walk to another part of the community, we discovered a beheaded coral snake.

Blocks were used to construct a pit where water could be gathered from a spigot off of the tank.

I found a good use for the pipe joints.

A concrete volcano.

Figuring out piping.

Pouring the concrete pad.

Getting ready for a community meeting.

The sun sets on another day of work.

Putting in stairs for the pit.

The ocean and the sun.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.