Progress on the Cabin

Construction of the cabin is moving ahead.  The walls and roof are up.  Wiring is going in.

The deck is going to be great in the summer.

The meadow is pretty at the end of summer.

The framing is all in and I’m working on pulling Ethernet wires, coaxial cable, and telephone wires.

A little storage shed in the woods.

Taking the Albino Rhino up to Dinkey Creek

We took the Albino Rhino up to Dinkey Creek to take the hard top off and put the soft top on.

Playing around out in the meadow at Forked Meadow.

The water retention systems are working pretty well.

Truck looking good!

Up on one of the logging roads.

 

The “Grand Canyon” is starting to fill in.  After every winter, it gets a little better.

The spring was flowing well.

Some snow plants pushing up through the forest floor.

 

Forked Meadow in January

I headed up to Forked Meadow to check things out in the winter and take some time to sift through some work stuff.  The best place to camp was on the deck of the shed.

No snow in the lower meadow.  I expected snow but this winter hasn’t been good for snow at this elevation.

Mary’s Meadow didn’t have any snow in it, either.

There was a little snow in the meadow between the landing and the cabin.

Walking up one of the fire access roads.

Dawn on the lower meadow.  It got pretty cold overnight.